Delivered mid-2024, Dudley Street is a stunning boutique, multi-residential, whole-floor unit block in the beachside lane ways of sun-drenched Mermaid Beach.
Drawing on our expertise in this niche built.form comprehensively re-worked the project’s design suite prior to tender to maximse savings in construction methodology and elevate the final built product.
Ultimately, built.form ensured that the delivered value and product was expertly tailored to the high demands of purchasers in the $3.5M-4.5M unit space and maximise development profitability for the client.
Constructed for delivery in record time. A superb addition to the evermore impressive boutique hi-rise portfolio in the Gold Coast’s most premium pocket.
Completed in mid-2024, the Dudley Street development is a refined boutique, multi-residential building comprising whole-floor units in a premium beachside laneway just off Mermaid Beach. With a project budget of $7.2M, Elevar (via built.form) worked carefully to redesign and optimise the architectural suite before tender, maximising construction efficiencies and elevating the finished product. The result is luxury whole-floor residences tailored for discerning buyers in the $3.5M–$4.5M range, delivered in record time and with exceptional craftsmanship by Mi Design Studio and Tonic Projects.